Investor Presentaiton
Asheshi Orogenic Gold
Prospect Work Programmes
Selective rock chip, grab, blading and 100m x 100m soil
sampling (2018 & 2019), identified 2 areas for follow up
drill testing (Asheshi Colonial Mine & the Albibi Shear).
Significant rock chip, grab and blading results for Au:
ASR007
ASD003
1m @ 7.14 g/t Au
(74-75m ASD003)
2m @ 5.51 g/t Au
(121-123m ASD003)
2m @ 2.08 g/t Au
(66-68m ASR003)
ASRO03
• 13.4 g/t Au
•
4.71 g/t Au
⚫
2.48 g/t Au
• 8.85 g/t Au
•
3.75 g/t Au
•
2.41 g/t Au
• 6.78 g/t Au
•
3.11 g/t Au
•
2.15 g/t Au
• 6.13 g/t Au
•
3.07 g/t Au
⚫
2.01 g/t Au
1m @ 2.72 g/t Au
(29-30m ASR008)
• 5.86 g/t Au
⚫
3.06 g/t Au
⚫
2.01 g/t Au
• 5.62 g/t Au
⚫
2.96 g/t Au
⚫
1.85 g/t Au
• 5.02 g/t Au
•
2.92 g/t Au
•
1.64 g/t Au
• 4.73 g/t Au
•
2.86 g/t Au
•
1.61 g/t Au
ASD004
Asheshi Colonial Mine
ASRO05
ASRO04
ASR006
Asheshi Blading
Rockchip Sampling
2m @ 1.22 g/t Au
(64-66m ASR006)
Drilled Holes
Diamond
RC
Proposed Holes
AU
0.000 -0.004
10
0.005 -0.100
ASR008
°
0.101-0.500
0.501 1.000
>1.000
Asheshi Albibi Qv
Asheshi Albibi_shear
Stream
Geology
Alluvium
Elluvium
Chert
23
Structural & lithological mapping complete.
Nine (9) hole RC drill programme (855m) June 2019.
Four (4) hole DD drill programme (576.7m) May-June 2019.
LeapFrog model compiled.
Petrography & geochronology study complete.
IP-Resistivity survey under consideration.
ASD002
ASD001
Albibi
Shear Zone
ASR001
3m @ 2.08 g/t Au
(58-61m ASD001)
ASRO02
ASR009
500m
Felsic flow
Gabbro
Granite
Maffic flow
Mafic dyke
Prospect Boundary
RC & Diamond drill holes and Blading sections on geology - AsheshiView entire presentation