FUKUSHIMA Lessons Learned

► Status at the plant on March 27: Project roadmap (1/3) Accumulation of radioactive waste water due to use of sea and fresh water to cool down the reactors If no solution is found, risk of overflow within 3 months ▶ The need expressed by TEPCO is a decontamination facility for highly radioactive water: With high decontamination factor: > 106 Bq/cm³ ◆ Capable of processing at a high throughput: 50m³/hour Small unit to be installed in an existant building ▸ Objectives on April 8: Adapt the CEA/AREVA co-precipitation process of water treatment to the salted contaminated water present in the buildings of the plant Adapt VEOLIA's ActifloTM system to nuclear environment resulting in the Actiflo™- rad system design Fabrication, delivery of equipment, on-site assembly, and start-up of active operation of the ActifloTM-rad system before end of June FUKUSHIMA Lessons Learned IAEA January 2013-- p.4 A AREVA