JSW Steel Corporate Presentation
Case study: Turnaround Strategy at JSW Ispat's Dolvi plant
SW Steel
JSW Steel has a proven track record of identifying, acquiring and integrating assets creating synergies and optimizing costs
December 2010
⚫ Plant under maintenance
⚫ Loss making at EBITDA level
High interest cost
Financially distressed
Completed initiatives -
FY2011-2015
• Infusion of equity
• Alignment of marketing strategies resulting
in freight synergies and VAT benefits
Reduction of high cost working
capital funding
⚫ Refinancing of existing debt
⚫ Electricity sourcing from JSW Energy at
competitive prices
Commissioning of 4 mtpa pellet plant,
1 mtpa coke oven, waste gas based 55MW
power plant, railway siding, and lime
calcination plant
FY2016-2017
Capacity expanded to 5 mtpa
⚫ Diversified product offering from Flat steel
only to mix of Flat and Long steel
FY2018-2022
• Capacity increased to 10 mtpa from 5 mtpa
• Major facilities setup include:
○ 4.5 mtpa Blast furnace with 5 mtpa
Steel Melt Shop
о
5 mtpa Hot Strip Mill
Inability to service existing debt
I
- Inadequate cashflows
- Corporate debt restructuring (CDR)
Exit from CDR
Stabilized/ramped-up the expanded
Generating positive profit after tax
capacity
I - Integrated Steel production
commenced
I
Able to leverage an acquisition to maximum value accretion through application of knowledge and experience
JSW Steel Corporate Presentation: May 2023
case
49