Investor Presentaiton
Progress of Reconstruction (2016~2018)
Decommissioning Roadmap
Period up to start of fuel
removal
2016
Period up to start of fuel debris retrieval
Unit 1: Removal
of wall panels of
the building cover
completed
2017
Unit3:Lower
part of RPV
surveyed
(Jul)
Period up to start of end of
decommissioning
2018
Frozen-soil land-side impermeable wall
Completed. 5-6 m gap in groundwater
level created on the mountain side
Generation of contaminated water
reduced to one-third of the amount
before (from 540 m3 to 170 m3/day)
➤ Fukushima Robot Test Field in service
➤ J-Village reopened
FUKUSHIMA
ROBOT
TEST FIELD
福島ロボットテストフィールド
(fully opened in 2020 after a phase-in)
Referenced from: https://www.facebook.com/robottestfield/photos/pb.100063135885143.-2207520000../335919594999936/?type=3
(fully opened in 2019)