Progress of Reconstruction (2016~2018) Decommissioning Roadmap Period up to start of fuel removal 2016 Period up to start of fuel debris retrieval Unit 1: Removal of wall panels of the building cover completed 2017 Unit3:Lower part of RPV surveyed (Jul) Period up to start of end of decommissioning 2018 Frozen-soil land-side impermeable wall Completed. 5-6 m gap in groundwater level created on the mountain side Generation of contaminated water reduced to one-third of the amount before (from 540 m3 to 170 m3/day) ➤ Fukushima Robot Test Field in service ➤ J-Village reopened FUKUSHIMA ROBOT TEST FIELD 福島ロボットテストフィールド (fully opened in 2020 after a phase-in) Referenced from: https://www.facebook.com/robottestfield/photos/pb.100063135885143.-2207520000../335919594999936/?type=3 (fully opened in 2019) 28