Investor Presentaiton slide image

Investor Presentaiton

The New "AMO" – Near Production Mine - ➤Last mined in 1994 gold price A$524/oz, today ~A$2,650/oz Phase 1 drilling delivered excellent grades at depth, 4m @ 7.51 g/t 8m @ 9.65 g/t 13m @ 4.48 g/t (New Western Lens) Planned new drill program ➤ Mine Design to be completed at A$2,550/oz Open pit and Underground potential Multiple targets along strike 14600mN 14400mN PROPOSED WASTE DUM 1000mRL 170 1 3 3 PARC005 CURRENT OPEN PIT PMRC012 PMR 4m @7.27g/t 7m @ 1.63git 900mRL BANDED AMPHIBOLITE 13m 4.48git 4m 7.51g/t Bm @ 9.65g/t Incl. 5m @ 13.93g/t PEM 3 80m STOPE Projecto from 18 100 33m PMRC030 6m @ 1.45g/t EMOLITE MAGNETIT BASALT META SEDIMENTS Mineralised Envelope PARC017 17m @ 1.33g/t Au incl. O 4m @ 2.80g/t Au and 5m @2.19g/t Au PARC021 11m @ 1.71g/t Au PARC023 11m @0.86g/t Au incl. 3m @ 1.52g/t Au PARC002 11m @ 1.34g/t Au PARC004 29m @1.04g/t Au incl. 4m 1.52g/t Au and 7m @ 2.87g/t Au PILOT OPEN PIT PRODUCTION 422,622t @2.42g/t for 28,860oz Greater Western Diamond Drill Hole Core Not Assayed Stope 4 Level 0 PEM 3 Conductor PARC011 5m @ 2.88g/t Au OPEN PIT TARGET PARC026 1000mRL- 800mRL 4m @ 1.17g/t Au incl. 1m @ 3.85g/t Aut 0 PARC016 6m @ 2.16g/t Au incl. 2m @5.58g/t Au 1m @ 26.7g/t Au 0 PEM 1 Conductor PARC010 10m @4.21g/t Au incl. 7m @ 5.69g/t Au 900mRL- 11m @ 3.31g/t Au incl. 800mRL- 4m @ 6.65g/t Au PEM 2 Conductor PARC005 13m @4.48g/t Au 4m @7.51g/t Au 8m @9.65g/t Au ●Proposed EIS Co-Funded Hole Holes Not Drilled Deep Enough Did Not Intersect Pilot Mineralisation or PEM 4 Conductor ALTAN Feb 22 - Depth Extension Drilling Planned Feb 22 Depth Extension Drilling Completed Altan Rio Drilling Historical Drilling O Hole Abandoned Reported Intercepts Main Lode PEM 4 Conductor 100m 700mRL PEM 4 4.80m GRANITE Phase 1 Drill Intercept Historical Drill Intercept >1gt Gold Mineralisation Envelope 700mRL- Pilot Deposit 14,520mN (Local Grid) 10 600mE 10 700mE 10 800m 50m 7 ALTAN RIO TSXV: AMO SLIDE 7
View entire presentation