Investor Presentaiton
The New "AMO" – Near Production Mine
-
➤Last mined in 1994 gold price A$524/oz, today
~A$2,650/oz
Phase 1 drilling delivered excellent grades at depth,
4m @ 7.51 g/t
8m @ 9.65 g/t
13m @ 4.48 g/t (New Western Lens)
Planned new drill program
➤ Mine Design to be completed at A$2,550/oz
Open pit and Underground potential
Multiple targets along strike
14600mN
14400mN
PROPOSED
WASTE
DUM
1000mRL
170
1
3
3
PARC005
CURRENT
OPEN PIT
PMRC012
PMR
4m @7.27g/t
7m @ 1.63git
900mRL
BANDED
AMPHIBOLITE
13m
4.48git
4m 7.51g/t
Bm @ 9.65g/t
Incl. 5m @ 13.93g/t
PEM 3
80m
STOPE
Projecto
from 18 100
33m
PMRC030
6m @ 1.45g/t
EMOLITE MAGNETIT
BASALT
META
SEDIMENTS
Mineralised
Envelope
PARC017
17m @ 1.33g/t Au incl. O
4m @ 2.80g/t Au and
5m @2.19g/t Au
PARC021
11m @ 1.71g/t Au
PARC023
11m @0.86g/t Au incl.
3m @ 1.52g/t Au
PARC002
11m @ 1.34g/t Au
PARC004
29m @1.04g/t Au incl.
4m 1.52g/t Au and
7m @ 2.87g/t Au
PILOT OPEN PIT
PRODUCTION 422,622t @2.42g/t for 28,860oz
Greater Western
Diamond Drill Hole
Core Not Assayed
Stope
4 Level
0
PEM 3 Conductor
PARC011
5m @ 2.88g/t Au
OPEN
PIT TARGET
PARC026
1000mRL-
800mRL
4m @ 1.17g/t Au incl.
1m @ 3.85g/t Aut
0
PARC016
6m @ 2.16g/t Au incl.
2m @5.58g/t Au
1m @ 26.7g/t Au
0
PEM 1 Conductor
PARC010
10m @4.21g/t Au incl.
7m @ 5.69g/t Au
900mRL-
11m @ 3.31g/t Au incl.
800mRL-
4m @ 6.65g/t Au
PEM 2 Conductor
PARC005
13m @4.48g/t Au
4m @7.51g/t Au
8m @9.65g/t Au
●Proposed EIS
Co-Funded Hole
Holes Not Drilled
Deep Enough
Did Not Intersect
Pilot Mineralisation
or PEM 4 Conductor
ALTAN
Feb 22 - Depth Extension Drilling Planned
Feb 22 Depth Extension Drilling Completed
Altan Rio Drilling
Historical Drilling
O Hole Abandoned
Reported Intercepts Main Lode
PEM 4 Conductor
100m
700mRL
PEM 4
4.80m
GRANITE
Phase 1 Drill Intercept
Historical Drill Intercept
>1gt Gold Mineralisation Envelope
700mRL-
Pilot Deposit
14,520mN (Local Grid)
10 600mE
10 700mE
10 800m
50m
7
ALTAN RIO
TSXV: AMO
SLIDE 7View entire presentation