NHPC Standalone Projects Under Clearance S. Installed Design Cost Projects Capacity Energy (In Crore) No. (MW) (MUs) & PL 3 Dugar 500 1760 (4 x103 + 4250 (Apr' 2021) • 2x44) Himachal Pradesh 31 एनएचपीसी NHPC • • • • • • • . • Status MoU was signed on 25.09.2019 between NHPC and Govt. of Himachal Pradesh for implementation of the Dugar HE Project (449 MW) by NHPC on BOOT basis for a period of 70 years. Project Installed capacity increased from 449 MW to 500 MW as per Power Potential Study by HPA, CEA on 22.10.2020, resulting increase in design energy from 1610 MU to 1758.40 MUS. Defence clearance has been accorded by MoD on 18.11.2020. MoEF&CC on05.08.2020 had issued TOR for the project. However, due to change in installed capacity of project from 449 MW to 500MW, amendment in TOR was accorded by MoEF&CC on 08.02.2021. CEA accorded the Concurrence on 26.04.2022. The completion cost of the project is Rs. 4250.20 Crore at Apr' 2021 PL with Levellised Tariff Rs. 4.46/unit as per the concurrence. Draft PIB proposal submitted to MoP on 22.07.2022 & 05.09.2022. MoP returned the draft proposal on 26.09.2022 for want of FC-I, EC & IWT Clearances. Subsequent to accord of concurrence by CEA, matter of Indus Water Treaty (IWT) clearance is being taken up with MOJS. CEA vide e-mail dated 19.10.2022 has sought clarifications regarding Pondage aspects w.r.t. Indus Water Treaty angle. The reply has been sent to CEA on 25.10.2022. EAC in its meeting on 29.08.2022 recommended the project for Environment Clearance, however the letter will be issued after obtaining FC (St-I) letter. Proposal for Forest clearance has been forwarded by State Govt. to MoEF&CC on 04.07.2022. MoEF&CC on 04.08.2022 has raised queries, reply to which was submitted by Nodal Officer (FCA), Shimla to MoEF&CC on 14.10.2022. MOEF&CC vide letter dated 03.11.2022 has directed IRO, Shimla to conduct the site inspection and furnish a report to the Ministry. In this regard, IRO, Shimla vide letter dated 17.11.2022 has informed that the site inspection can be conducted after winter season.
View entire presentation