NHPC Capacity Addition and Financial Overview
NHPC - Projects in Operation
एनएचपीसी
NHPC
25
Installed
Design
Tariff
NHPC Project &
Year of
Capital Cost
S. No
Capacity
Energy
State/UT
comm.
as on 31.03.23
(MW)
(MU)
(18-19)
(Rs. /Kwh)*
Type of the project
1
Baira Siul (3x60)
180
708.59
1981
311.89
2.23
Run of River (ROR) with small
Himachal Pradesh
(Sep)
pondage
2
Loktak, (3x35)
105
448.00
1983
183.73
3.89
Storage
Manipur
(May)
3
Salal, (6x115)
690
3082.00
1987
1046.78
2.82
ROR
UT of J&K
(Nov)
Tanakpur, (3x40)
94
452.19
1992
430.34
5.19
ROR
Uttarakhand
(Apr)
5
Chamera-1, (3x180)
540
1664.55
1994
2107.30
2.22
Storage
Himachal Pradesh
(Apr)
6
Uri-1, (4x120)
480
2587.38
1997
3459.33
2.33
ROR
UT of J&K
(Apr)
7
Rangit, (3x20)
60
338.61
2000
520.42
4.27
ROR with small pondage
Sikkim
(Feb)
8
Chamera-11, (3x100)
300
1499.89
2004
2027.62
.01 ROR with sm
ROR with small pondage
Himachal Pradesh
(Feb)
Dhauliganga-1, (4x70)
280
1134.69
2005
1764.61
2.65
ROR with small pondage.
Uttarakhand
(Oct)
10
Dulhasti, (3x130)
390
1907.00
2007
5232.07
5.37
ROR with small pondage
UT of J&K
(Mar)View entire presentation