Gatos Silver Investor Presentation Deck slide image

Gatos Silver Investor Presentation Deck

CLG Asset Performance Strong operating results with further optimization potential + Mill exceeding design capacity ▪ Record throughput of 2,916 tpd in Q3'23 Achieving >15% above design capacity + Cost discipline ■ Continuous improvement with focus on effective cost management ▪ Initiatives helping to offset inflation and strong Mexican peso exchange rate + Focused on mine productivities ▪ Maintenance and equipment utilization ▪ Backfill optimization ▪ Mill has additional capacity Increased 2023 production guidance Mill Throughput and Silver Grade Throughput (tpd) 3,000 Silver Eq. Production (Moz) 2,750 2,500 2,250 2,000 5 3 2 1 356 0 Original throughput design 2,847 2,862 Q3 2022 Silver Eq. Production and By-product AISC (¹) Cost of Sales ($M) $28.6 $25.5 4.3 2.7 387 $10.04 Q3 2022 Q4 2022 4.2 2.9 $12.13 329 Q4 2022 2,894 Q1 2023 $26.0 3.7 2.4 $6.11 Q1 2023 265 2,916 Q2 2023 $25.8 3.3 $14.32 2.0 Q2 2023 GATOS SILVER 285 2,916 Q3 2023 $31.4 3.5 $14.71 2.2 Q3 2023 Throughput 400 350 300 250 200 150 100 50 0 Silver Eq. Silver $30 $25 $20 $15 $10 5₁ Silver Feed Grade (g/t) $0 By-product AISC ($/oz Ag) 6
View entire presentation