VISION ELITE slide image

VISION ELITE

2 DORADO DEVELOPMENT CONCEPT SELECT PHASE (PRE-FEED) TO BE COMPLETED THIS QUARTER Three parties short listed in WHP tendering phase Offtake tanker Subsea infrastructure pre-FEED contract issued WHP Topside Jacket J-tube Rigid Riser Piles Diverless subsea connectors FPSO (Hull & Topside) Three short listed parties in competitive FPSO design phase Offloading hose and reel DTM (Disconnectable Turret Mooring) Subsea Buoy Water Depth-90m Flowlines Flexible Risers Tether Base Piles Legend Oil Production Flowline Mooring Chain. Gas Injection Flowline Umbilical Line Conceptual design for the production wells is now complete
View entire presentation