Investment Highlights - Tchaga Prospect
1,005,000
225,000 mE
Mako Gold
GOGBALA PROSPECT - ON SAME FAULT AS TCHAGA
4m @ 2.72g/t Au
11m @ 1.67g/t Au
6m @ 4.97g/t Au
3m @ 6.4g/t Au
2m @ 16.81g/t Au and
5m @ 2.12g/t Au
225,500 mE
2km
6m @ 2.0g/t Au
1,004,500 mN
[7m @ 2.73g/t Au
4m @ 2.63g/t Au
Drill Hole Legend
(Au gram metres)
@
>50
10 to 50
5 to 10
1m @ 8.78g/t Au
0
1 to 5
12m @ 5.39g/t Au
<1
1,004,000 mN
6m @ 2.67g/t Au
200m
Gold Soil Contour
+40 ppb Au
7m @ 1.42g/t Au
Structure
Napie fault (D1)
Later fault (D2)
Gogbala Prospect Plan View on IP Background
1 Refer to ASX announcements dated 9 July 2018, 13 March 2019, and 15 March 2021
10,000m of RC/DD drilling underway
✰ Following up on high-grade gold mineralisation
outlined over 2km in wide-spaced drilling
Target is same size as Tchaga Prospect
Previous results include¹
◆ 12m at 5.39g/t Au from 11m
◆
2m at 16.81g/t Au from 2m
17m at 1.68g/t Au from 45m
◆ 7m at 2.73g/t Au from 77m
6m at 4.97g/t Au from 68m
14View entire presentation