Investment Highlights - Tchaga Prospect slide image

Investment Highlights - Tchaga Prospect

1,005,000 225,000 mE Mako Gold GOGBALA PROSPECT - ON SAME FAULT AS TCHAGA 4m @ 2.72g/t Au 11m @ 1.67g/t Au 6m @ 4.97g/t Au 3m @ 6.4g/t Au 2m @ 16.81g/t Au and 5m @ 2.12g/t Au 225,500 mE 2km 6m @ 2.0g/t Au 1,004,500 mN [7m @ 2.73g/t Au 4m @ 2.63g/t Au Drill Hole Legend (Au gram metres) @ >50 10 to 50 5 to 10 1m @ 8.78g/t Au 0 1 to 5 12m @ 5.39g/t Au <1 1,004,000 mN 6m @ 2.67g/t Au 200m Gold Soil Contour +40 ppb Au 7m @ 1.42g/t Au Structure Napie fault (D1) Later fault (D2) Gogbala Prospect Plan View on IP Background 1 Refer to ASX announcements dated 9 July 2018, 13 March 2019, and 15 March 2021 10,000m of RC/DD drilling underway ✰ Following up on high-grade gold mineralisation outlined over 2km in wide-spaced drilling Target is same size as Tchaga Prospect Previous results include¹ ◆ 12m at 5.39g/t Au from 11m ◆ 2m at 16.81g/t Au from 2m 17m at 1.68g/t Au from 45m ◆ 7m at 2.73g/t Au from 77m 6m at 4.97g/t Au from 68m 14
View entire presentation