Panasqueira Tungsten-Tin Mine Presentation slide image

Panasqueira Tungsten-Tin Mine Presentation

ALMONTY'S GLOBAL PRESENCE Diversified and Experienced Operator in Conflict-free Regions 3 1 4 PRODUCING ASSET UNDER CONSTRUCTION DEVELOPMENT PROJECTS A ALMONTY fin + Downstream 2 In S. Korea, see slide 17 & 35 PANASQUEIRA - PORTUGAL ACQUIRED: 2016 STAGE: PRODUCTION P&P: 3,056kt @ 0.21% WO3* M&I: 11,855kt@ 0.23% WO3 Inferred: 10,631kt @ 0.24% WO3 2 3 SANGDONG - SOUTH KOREA ACQUIRED: 2015 STAGE: CONSTRUCTION P&P: 7,896kt @ 0.45% WO3 M&I: 8,334kt @ 0.49% WO3 Inferred: 52,765kt @ 0.44% WO3 VALTREIXAL - SPAIN ACQUIRED: 2013-2016 STAGE: PRE-FEASIBILITY P&P: 2,577kt @ 0.35% WO3 Eq. M&l: 2,833kt @ 0.36% WO3 Eq. Inferred: 16,755kt @ 0.18% WO3-Eq. 4 LOS SANTOS TAILINGS - SPAIN ACQUIRED: 2011 STAGE: CARE & MAINTENANCE P&P: 3,767kt @ 0.13% WO₂ M&I: 3,767kt @ 0.13% WO3 WO3 = Tungsten(VI) oxide, also known as tungsten trioxide is a chemical compound of oxygen and the transition metal tungsten, with formula WO3 Note: Reserves & resources are based on the latest available N143-101 information 5
View entire presentation