Key considerations in RE implementation - Policies • Few states policies: State Policies (exy. Rajasthan Net Metering Policy) : Grid connectivity subject to the following conditions 1) Maximum Rooftop PV Solar Power Plant capacity shall not be more than 80% of the sanctioned connected load/contract demand of the consumer PTC India 2) Cumulative capacity shall not exceed 30% of the capacity of the distribution transformer Detailed net-metering procedure, guidelines including Standards and Safety related to Interconnection with the Grid are in place - islanding condition.