Generation
10,420 MW
generation portfolio
Transmission
> 16,300 km of transmission and
high voltage distribution lines
During 1H2021:
Distribution
236 primary and > 15,100
secondary substations
Retail
16,421 GWh sold and
2.69 million customer accounts
Guangzhou Pumped Storage
Power Station at Conghua
Local electricity sales increased 4.4% to 16,421GWh as compared
with 1H2020
No. of customer accounts increased by 37k to 2,687k as compared
with 1H2020
Major infrastructure projects ongoing
A new 550MW gas-fired generation unit at Black Point Power Station
was commissioned in 2020
Construction of a second CCGT unit at Black Point continued to make
good progress. Early civil works are progressing well and engineering,
procurement and construction contracting is under way
The seventh unit of gas turbine upgrade project at Black Point Power
Station completed with 25MW generation capacity added (175MW
added in total)
Over 50 km of new transmission and high voltage distribution lines &
70 new substations added
We generate, transmit and distribute electricity
to over 80% of Hong Kong's population in Kowloon,
the New Territories and on Lantau Island
CLP 中電 120
years 同行望遠
of shared vision
Shekou
Black Point,
Power Station
Castle Peak
Power Station V
Shenzhen
Shenzhen China
YSS
New Territories
stem Control Center
Penny's Bay
Power Station
Airport
Lantau Island
You Ma
400KS
Kowloon
Hong Kong Island
Daya Bay Nuclear
Power Station
Main Transmission Network (1H2021)
Π
CLP Supply Area
Power Station
400kV Substation
132kV Substation
System Control Centre
400kV Circuit
132kV Circuit
132kV Submarine Cable