Rio Grande LNG Expected EPC Cost¹
Lump-sum turnkey (LSTK) EPC agreements enhance certainty of project execution for first three (3) Trains
All five (5) Trains using proven and dependable Air Products C3MR™ technology and Baker Hughes rotating equipment
BECHTEL
Summary of LSTK
EPC Agreements
Trains
2
Trains
3
Capacity
Up to
11.74 mtpa
(5.87 mtpa per train)
Capacity
Up to
17.61 mtpa
(5.87 mtpa per train)
EPC cost 2
Cost per tonne
2
~ $7.5 billion
$638
EPC cost 3
Cost per tonne
~
$10 billion
$568
Two (2) Train workplan includes full site preparation, which is expected to reduce cost per tonne of the remaining trains
Rio Grande LNG is expected to be one of the lowest cost greenfield LNG project built on the U.S. Gulf Coast
Full 5 Train EPC Costs estimated to be $500/tonne4
~
1 Bechtel EPC contract price validity expired December 31, 2021. Final EPC contract pricing to be determined prior to FID. | 2 The expected EPC cost for 2 trains includes two 180,000 cubic meter storage tanks and one marine berth. | 3 The expected EPC cost for 3 trains includes
two 180,000 cubic meter storage tanks and two marine berths. | 4 Assuming nameplate capacity and estimated total EPC cost for five (5) Trains.