Growth Ambitions and Development Updates
Stage 2 - Hayes Creek
Two Zinc-Gold-Silver Rich VMS Deposits
✓ 3Mt of high-grade (11.9% ZnEq) Mining Inventory of which 98%
Indicated*
100 lev
46
56
69
75
89
24 25
36 45
758 784
839
847 88
13
22 23
35
55
61
66
787 772 82
-Elev
60
705
76
910
41
1920
31 32
51
42
57
62
52
58
63
16
27
39
48
49
2829
40
100-Elev
15
26
47
38
Stope Ave
Grade Zn%
Looking
NW
100-Elev
0 Elev
100 Elev
Proposed plant location at Fountain Head
utilises historic open-pit for TSF, existing water,
rail, gas, grid power, camp facilities
768,000 mE
ALRA Abonginal
Land Claim
Head Rd
000 mE
Fountain
Head
fossicking reserve
"Douglas North
DC2001/023
NTD6023/2001
Mt Osbourne
Tower
776,000 mE
PNX
"West Ban Ban #2°
DC2004/005
METALS
NTD6023/2001
Ban Ban Pastoral Station
Mt Wells Road
H
Northpoint
Grove Hill Road
Exclusion from
Douglas Station
Po native title claim
Princess Louise
Iron Blow
Absent
Douglas Pastoral Station
0-2
2-4
4-6
6-8
Fishers Lode
8-10
0
10-12
200 Elev
kilometres
Davie
Stuart Highway
Mt Bonnie
8.508.000 mN
"Mary River West"
DC2001/006
NTD6006/2001
Mary River Wes
Pastoral Station
8,504,000 mN
,500,000 n
Mining areas sit on granted MLs, less than 3km apart
15-20km along existing haul roads from mine location
Low-cost open-pit mining to start at Mt Bonnie, then
underground mining at Iron Blow
PNZ
PNX Mineral Leases
Burnside Project ELS
Other Mineral Leases
Gas Pipeline
Reserved Land
Pastoral Lease Boundary
100m RL contour
200m RL contour
Darwin-Adelaide Railway
XHV Powerlines 66 kVa
HV Powerlines 11 kVa
NLC native title
claim boundaries (approx)
ALRA Aboriginal
Land Claim
Major Road
Minor Road
Track
Main Watercourse
H
Grove Hill Hotel
Q
Airstrip
Historical Open Pit
*See Appendix for further details
23
METALSView entire presentation