Investor Presentaiton
Energy: Sector aspirations
Power
■ Increase power generation to 20GW
by 2018 and to 350GW by 2043, with
focus on gas as the immediate priority,
and adding renewable sources
after 2023
Strengthen and increase transmission
capacity, with immediate focus on the
national backbone
■ Increase distribution capacity, with
priority placed on making power
available for industrial users and
reducing distribution losses
Finalise privatization of power
generation and distribution, and extend
privatization to include NIPP assets
Build capabilities, increasing human
capacity 20 times by 2023 and 40
times by 2043
Oil & Gas
Provide gas distribution infrastructure
to increase gas utilization
■ Increase capacity in oil/gas production.
Increase refining capacity to fully meet
national demand
Intensify exploration activities.
Increase the percentage of capital
expenditure in-country
■ Increase bulk storage capacity for oil
and gas
■ Increase the capacity of the
☐
pipeline network
Increase the use of sustainable fuels
Establish links to the regional gas
network (West African Gas Pipeline,
Nigerian phase of the trans-Saharan
gas pipeline)
SOURCE: Energy TWG
49View entire presentation