Investor Presentaiton
Consolidated Production, Costs, Guidance Summary
Production Summary
Consolidated
Q3 Mar
FY15
Q4 Jun
FY15
Year
FY15
Q1 Sep
FY16
Q2 Dec
FY16
Production
Gwalia
King of the Hills
Simberi
Consolidated
Guidance
FY163
St Barbara
LIMITED
6 65 66
OZ
76,954
57,208
248,142
72,388
63,533
OZ
11,836
15,014
49,677
9,112
_5
22,498
27,137
79,568
29,539
28,379
100
-
245 260 koz (prev 230 to 250 koz)
9 koz4
110 koz
(prev 90 to 110 koz)
OZ
111,288
99,359
377,387
111,039
91,912
354-379 koz
(prev 329 to 369 koz)
Mined Grade
Reserve gradeĀ²
Gwalia
g/t
9.7
8.6
8.9
9.7
7.9
King of the Hills
g/t
4.1
4.5
4.2
3.9
_5
Simberi
g/t
1.38
1.28
1.23
1.22
1.22
9.4
n/a
1.3
Total Cash Operating Costs[1]
Gwalia
$/oz
532
729
642
553
665
n/a
King of the Hills
$/oz
1,177
1,095
1,112
893
n/a
Simberi
$/oz
1,193
1,034
1,336
1,119
1,098
n/a
Consolidated
$/oz
734
868
850
731
799
All-In Sustaining Cost[1]
Gwalia
$/oz
645
860
841
692
846
840 900 (prev 875 to 940)
King of the Hills
$/oz
812
1,106
1,103
964
Simberi
$/oz
1,310
1,149
1,464
1,252
Consolidated
$/oz
798
979
1,007
863
1,319
992
1,350 - 1,430
990-1,060
(prev 1,275 1,400)
(prev 995 to 1,070)
Capital Expenditure
Gwalia
$M
King of the Hills
$M
Simberi
$M
Consolidated
$M
30-35
10-12
38-49
(prev 8-12)
1.
2.
3.
4.
5.
38 / Asia Investor Relations Roadshow / March 2016
Non-IFRS measure, refer relevant slide in Appendix
Ore Reserve grade at 30 June 2015, refer Ore Reserve and Mineral Resources Statement released 25 August 2015
FY16 guidance issued in the June 2015 Quarterly Report, and revised on 8 Jan 2016 and in this report.
Stockpiled as at 30 June 2015.
King of the Hills ceased mining in April 2015 and ceased processing in September 2015. It was sold in October 2015
(refer ASX announcement 16 October 2015)View entire presentation