Rosh Pinah "RP2.0" Expansion Pre-Feasibility study highlights (August 2020) 1.3Mtpa Mill Modified plant to include SAG mill, crushing and ore blending system Paste Fill Plant Will reduce surface tailings as redirected underground as paste fill Paste Fill Will increase ore recovery and reduce dilution WF3 Portal Dedicated portal for WF3 deposit SOF New Trucking Decline & Mobile Equipment Fleet Upgade from 30t to 60t trucks Reduction in hauling distance and traffic Improved ventilation ROSH PINAH 2.0 Looking North East EOF TREVALI Single stage SAG mill crushing and ore blending system with a nominal throughput increase from 0.7 to 1.3 Mtpa. Paste fill plant and reticulation system will reduce surface tailings and mining dilution while increasing ore recovery. Dedicated portal and decline with associated infrastructure for the WF3 deposit. Project Capital Cost of $93M and Construction of the expansion project assumed to commence in Q1 2022 and commercial production to be achieved by start of Q1 2023. Underground mobile equipment moving from 30 to 60 tonne haul trucks. Note: refer to the Company's August 25, 2020 news release for full details. 8
View entire presentation