Transurban Group Strategy Overview
ASSET PORTFOLIO AT 30 JUNE 2021
OVERVIEW
Opening date
Remaining concession period¹
Concession end date
PHYSICAL DETAILS
Length-total
Length-surface
Length-tunnel
Lanes
OWNERSHIP
TOLLING
Large vehicle multiplier
Transurban
GATEWAY
MOTORWAY
Dec 1986
31 years
LOGAN
MOTORWAY
Dec 1988
31 years
CLEM7
BRISBANE
GO BETWEEN
BRIDGE
LEGACY
Mar 2010
30 years
Jul 2010
42 years
WAY
Jun 2015
44 years
AIRPORTLINK M7
Jul 2012
32 years
Dec 2051
Dec 2051
Aug 2051
Dec 2063
Jun 2065
Jul 2053
23.1 km
39.5 km²
6.8 km
0.3 km
5.7 km
6.7 km
23.1 km
39.5 km²
2.0 km
0.3 km
1.1 km
1.0 km
4.8 km
4.6 km
5.7 km
6,8 and 10 (various)
12 Gateway Bridge
62.5% Transurban
25% AustralianSuper
12.5% Tawreed
LCV-1.5x
HCV-3.15x3
2x2
2x3 some sections
62.5% - Transurban
25% AustralianSuper
12.5% Tawreed
LCV-1.5x
HCV-3.15x3
2x2
62.5% - Transurban
25% AustralianSuper
12.5% Tawreed
2x2
2x2
2x3
62.5%-Transurban
25% AustralianSuper
12.5% Tawreed
62.5% - Transurban
25% AustralianSuper
12.5% Tawreed
62.5% Transurban
25% AustralianSuper
12.5% Tawreed
LCV-1.5x
HCV-3x (day)
2.65x (night)
LCV-1.5x
HCV-3x (day)
2.65x (night)
LCV-1.5x
HCV-3x (day)4
2.65x (night)
LCV-1.5x
HCV-2.65x
1. As at 30 June 2021. Rounded to nearest year.
2. Includes Gateway Extension Motorway.
3. Gateway and Logan HCV tolls progressively increasing to a maximum of 3.44x car tolls post Logan Enhancement Project completion.
4. HCV multiplier changed to 3x cars during peak periods from 1 July 2020.
TRANSURBAN OVERVIEW | AS AT 30 JUNE 2021
38View entire presentation