Perama Hill Project Overview
Mineral Resources (Copper, Lead, Zinc) as of September 30, 2023
Project
Measured Resources
Indicated Resources
Total Measured and Indicated
Inferred Resources
COPPER
Tonnes
Cu
Contained
Cu
Tonnes
Cu
Contained
Cu
Tonnes
Cu
(x1000)
%
tonnes
(x1000)
%
tonnes
(x1000)
%
Contained
Cu
tonnes
Tonnes
Cu
(x1000)
%
Contained
Cu
tonnes
(x1000)
(x1000)
(x1000)
(x1000)
Skouries
90,714
0.51
466
149,260
0.44
652
239,974
0.47
1,118
67,657
0.40
267
TOTAL COPPER
90,714
0.51
466
149,260
0.44
652
239,974
0.47
Contained
Contained
LEAD
Tonnes
Pb
Pb
Tonnes
Pb
Pb
Tonnes
Pb
1,118
Contained
Pb
67,657
0.39
267
Contained
Tonnes
Pb
Pb
(x1000)
%
tonnes
(x1000)
%
tonnes
(x1000)
%
tonnes
(x1000)
%
tonnes
(x1000)
(x1000)
(x1000)
(x1000)
Olympias
3,447
4.8
167
8,992
4.9
441
12,439
4.9
608
2,339
6.2
146
Stratoni
0
0.0
0
1,391
6.0
84
1,391
6.0
84
1,807
6.9
124
TOTAL LEAD
3,447
4.84
167
10,383
5.1
525
13,830
5.0
692
4,146
6.5
270
Contained
Contained
Contained
Contained
ZINC
Tonnes
Zn
Zn
Tonnes
Zn
Zn
Tonnes
Zn
Zn
Tonnes
Zn
Zn
(x1000)
%
tonnes
(x1000)
%
tonnes
(x1000)
%
tonnes
(x1000)
%
tonnes
(x1000)
(x1000)
(x1000)
(x1000)
Olympias
3,447
5.9
204
8,992
6.6
593
12,439
6.4
797
2,339
6.8
160
Stratoni
0
0.0
0
1,391
8.4
117
1,391
8.4
TOTAL ZINC
3,447
5.9
204
10,383
6.8
710
13,830
6.6
46
117
1,807
8.3
150
914
4,146
7.5
310
eldorado gold
59
59View entire presentation