Investor Presentaiton
Investment
Highlights
Amulsar is one of only
a few large-scale, low-
cost, heap-leach gold
projects which when
fully ramped-up will be
one of the world's top
gold mines
annual production and
all-in cost basis....
3
on an
LYDIAN
INTERNATIONAL
100% Lydian owned, open-pit, heap leach gold
project
Current resource (March 2013):
52.4 Mt at 1.1 g/t gold (1.8Moz) Measured category
18.1 Mt at 1.0 g/t gold (0.6Moz) Indicated category
58.0 Mt at 0.9 g/t gold (1.7Moz) Inferred category
Feasibility study Sept 2012 - NPV US$646, IRR
28% (at US$1200/oz gold)
10Mtpa, 150-250k ounce gold producer
Roads, power, water, electricity, gas and fibre
optic cable all transect the license area, labour
sourced from local communities
Metallurgical testing +90% recoveries including
'cold climate' testing
Oxide resource; open in all direction
Supportive global shareholder base including
IFC/EBRD
Strong community support in Armenia
lydianinternational.co.ukView entire presentation