Investor Presentaiton slide image

Investor Presentaiton

Galilee Basin - ATPs 743, 744, 1015 ("Deeps") • Vintage 15% (earning up to 30%), Comet Ridge 85% and operator • Stage 2 underway - Vintage to fund 50% of $10 million program to earn additional 15% Revert to equity interest post initial JV spend of $10 million • Koburra seismic program completed - 336 km 2D seismic acquired - - - 619 km of existing 2D to be reprocessed Data ready for interpretation in Q4 FY19 Gross cost of $4.3 million (net $2.1 million) Enhanced leads and prospects in Q1 2019 Potential for additional structures with large gas accumulations *During 2015, SRK Consulting (Australia) Pty Ltd, ('SRK'), conducted a technical analysis of the available Carmichael Field seismic and well data for Comet Ridge. Estimates are in accordance with the Petroleum Resources Management System (SPE, 2007) and Guidelines for Application of the PRMS (SPE, 2011). No Reserves were estimated. Probabilistic methods were used. Sales gas recovery and shrinkage have been applied to the Contingent Resource estimation. The losses include those from the field use, as well as fuel and flare gas. SRK has also been provided with the well data from Albany-1 and is of the view the well results are consistent with their estimates of contingent resources. Refer explanatory notes for detail. 70 60 50 40 30 20 10 0 Petroleum well ATP 743 ATP 1015 ATP 744 Carmichael-1 Albany-1 0 Proposed well ATP 1015 0 Lead and prospect Koburra 2D seismic survey Existing seismic survey Vintage interest permit ATP 1015 50 km Albany-2 Lake Galilee-1 VINTAGE ENERGY 1C, 2C and 3C contingent resources* VE19-001 Net 1C Net 2C Net 3C Expanded 2D seismic survey due to increased prospectivity following Albany-1 success 8 00
View entire presentation