Sustainability: Q3 FY24 Performance
Climate
Change
.
Key Highlights
Increased share of renewable energy for deep decarbonisation
Wind Projects - Tuticorin - generation started and commissioned 232.2
MW till Q3 FY 24.
Continuous focus on process improvements to reduce GHG emission
Performance
Ash Utilisation (%)
100%
100%
100%
100%
JŚW
SW Energy
•
Maintained zero liquid discharge across operations
Water
Security
•
Optimizing utilization of rain water harvesting system. 44,866 m3 water utilized by
Ratnagiri Plant by this method
FY22
FY23
FY24
Target
9M FY24
•
Reuse of treated effluent of Sewage Treatment Plant for horticulture
CO2 intensity (tCO2e/MWh)
PM Emissions (kg/MWh)
0.68
0.68
.
Reutilising pond ash as well as bottom ash in Boiler.
0.140
0.60
0.59
0.122
0.110
0.103
Waste
•
Continue 100% Ash utilization initiatives at all plants through tie-ups with
cement factories & similar businesses
Over 19,200 MT Fly ash exported by Ratnagiri Plant
FY22
FY23
•
Ensuring ESP (Electrostatic Precipitator) Fields availability
FY24
Target
9M FY24
FY22
FY23
FY24
Target
9M FY24
Air
Emissions
.
Process efficiency improvements being done in all plant locations
•
Lime Dozing system availability and parameters optimization at Barmer to
reduced air emissions
SOx Emissions (kg/MWh)
NOx Emissions (kg/MWh)
1.55
0.81
0.69
0.65
1.25
0.54
1.15
1.03
•
Biodiversity
In Q3 FY24 2,271 saplings of various native species planted around the
operational boundaries of Plants. Mango plantation of 7,800 trees out of 10,000
planned completed at Ratnagiri Plant.
•
Biodiversity Assessment - Phase 2 is in process for Ratnagiri Plant
JSW Energy Corporate Presentation - Jan 24
FY22
FY23
FY24
9M FY24
FY22
FY23
FY24
Target
9M FY24
Target
FY 2024 Targets include generation from Ind-Barath Thermal Power Plant for part of the year 13View entire presentation