Investor Presentaiton slide image

Investor Presentaiton

Onslow (Hydromet Plant) & Yangibana (Bene Plant) 7,600,000 7.590,000 7.580.000 Legend Road ANSIA Boundary Gas Pipeline Lease Hydromet Proposed Site Horizon_power_station Wheatstone Site Macedon Site Bore MDW4 }{ HASTINGS Technology Metals Limited 1 Location close to Power, Water and Gas services 2 Hydro upgrades concentrate to 59% TREO 3 Tier 1 Metso-Outotec equipment selected 4 Beneficiation upgrade of concentrate to 27% TREO 115°15'E 114 50E 114°55'E 115°0'E 115°5'E Onslow Townsite 21°40'S C4 Waste Facility Macedon Site Km GDA 1994 MGA Zone 50 Wheatstone Site Hydromet Plant (proposed site) Horizon power station MDW4 Bore C4 Waste Facility 21°45'S 21°50'S 255'S 1 Refer ASX announcement "Successful Completion of Yangibana Definitive Feasibility Study", dated 28 November 2017 7 270,000 280,000 Hastings Technology Metals Limited (HAS.ASX) 320,000 Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES Airbus DS, USDA, USGS, AeroGRID, IGN, and the GIS User Community 310,000 Investor Presentation, 25 November 2021
View entire presentation