Investor Presentaiton slide image

Investor Presentaiton

1. Fortuna Project Shallow, wide, high-grade copper mineralisation confirmed 297300mE . El Quillay host structure is 3km with numerous targets to be tested. Section 3 Surface 0.48 0.73 1.31 3 CMEQD002 7.5 1.89 750mRL 5.8m @0.78% CuEq from 15.2m to 21m 3 Results from initial El Quillay North drillhole (CMEQD002) returned¹: - 5.8m @ 0.78% CuEq from 15.2m; and - 26m @ 0.81% CuEq from 29m, including 4m @ 1.87% CuEq from 51m. Second drill hole (CMEQD001) intersected 23m from 20m downhole, with assay results expected in the coming weeks. 1. Refer ASX announcement 16 January 2023. 2. Refer ASX announcement 19 December 2023. CULPEO MINERALS ASX:CPO | OTCQB:CPORF 700mRL 26m @ 0.81% CuEq from 29m to 55m OPEN 25m 0.36 3 OPEN 1.88 3.4 8 1.50 15 0.77 2 1.88 CuT (%) metres 3.4 Oxide Sulphide Cross sections through the El Quillay North Prospect, with results of CMEQD002. (refer ASX announcement 17 January 2023). Base of Oxidation > 0.70% CUT 0.40 0.69% CuT INVESTOR PRESENTATION 12
View entire presentation