Investor Presentaiton slide image

Investor Presentaiton

eneva Portfolio...... At the end of 2021, our businesses focused on: Power generation: With an electric generation park of 3.1 GW of installed capacity (71% operational), we generate safe and competitive energy for the Brazilian electrical system, representing 9% of the country's gas-fired thermal capacity. In the segment, our portfolio consisted of nine thermoelectric generation plants (two under construction and one under commission), a solar plant and a wind farm under development, in addition to assets focused on Distributed Generation. > Maranhão - we own the Parnaíba Complex, formed by natural gas plants Parnaíba I, Parnaíba II, Parnaíba III and Parnaíba IV with 1.4 GW, and two projects in development, Parnaiba V and Parnaiba VI, with 477 MW. In addition, we operate Itaqui plant, coal-fired, with 360 MW. 1) 3.7 GW from 2022, considering Futura I solar plant, under construction in the period. > Ceará - we operate the Pecém II plant with 365 MW of coal-fired generation. We are also responsible for Tauá Plant (1 MW), the first solar plant to generate electricity on a commercial scale in Brazil, as well as its 64 MW expansion, which already has approved environmental licenses. > Roraima - Natural Gas plant Jaguatirica II, with 142 MW. > Rio Grande do Norte - we developed the Santo Expedito Wind Farm, with all licenses approved for its construction, with 330 MW. In addition to these assets, we will start, in 2022, in Amazonas, the construction of TPP Azulão (295 MW), expanding the R2W model to the state, where we already operate the Azulão gas treatment plant (GTP). The new plant, which will require investments of R$ 1.3 billion, was made possible in 2021, in the energy capacity auction, held by the Brazilian Ministry of Mines and Energy (MME), on December 21. At the end of the year, we also owned the Santo Expedito Wind Power Project, in final licensing phase. The project, of wind generation, located in Rio Grande do Norte, will have 333 MW of installed power and a capacity factor (P50) of 57.5%. sustainability report 2021 Futura | construction, Juazeiro, BA <16> about us =
View entire presentation