Investor Presentaiton
5 Material wise, we are ready to distribute a 20% blend of hydrogen with NG.
Specifically, pipeline components are prepared to a large extent for 100% H2
distribution (1)
Current Steel and PE Pipeline Breakdown
6
■Owned LP and MP PE in
km
14 145
29%
■Owned LP and MP Steel
in km
34 949
71%
Source: GasNet; Marcogaz (EU); NREL (USA); GRTGaz (FR); HyDeploy (UK); Hy4Heat (UK); internal analysis.
•
•
•
PE mains are crucial for future distribution of blended gases and
hydrogen
CGNI is well-positioned with its current pipeline material mix
A significant proportion of ~71% of current, owned local
network length are already in PE
60% of municipalities have already a PE pipeline share higher
than 99%
By replacing legacy materials (steel) with modern materials (PE),
the Company also expects to drive emission and cost savings.