Investor Presentaiton slide image

Investor Presentaiton

CHINA YUNNAN COPPER AUSTRALIA LIMITED Mt Dorothy Drill Section Target Dimensions ■ Ernest Henry style breccial mineralisation Mt Dorothy drill results: 35m @ 1.52% Copper & 397ppm Cobalt Chacopyrite & chalcocite sulphide breccia surrounded by lower grade native copper 'envelope' Phase 2 - Depth & along-strike drilling in September to build dimension ■ Cobalt credits ■ Possible metallurgical test work after Phase 2 drilling. A R.L. 450m- 400m 300m- Proposed drillhole 10m@411ppm Co 0.04% Cu Open 380,600mE Native Copper Zone Cu - Co Sulphide Zone MDR003 MDR002 [email protected]% Cu, 232ppm Co [email protected]% Cu, 116ppm Co 19m@64ppm Co, 2.31% Gu, [email protected]% Cu, 591ppm Co [email protected]% Cu. 397ppm.Co 380,700mE 7,696,000mN Native Copper Zone MDR0011 WW201, CC001D [email protected]% Cu, 81ppm Co [email protected]% Cu, 23ppm Co [email protected]% Cu, 190ppm Co [email protected]% Cu 32ppm Co 110m@0,57% Cu [open] [email protected]% Cu Native Copper 350m- Sulphide Breccia [email protected]% Cu [open] [email protected]% Cu, 44ppm Co 15m@028% Cu, 32ppm Co [email protected]% Cu, 57ppm Co Native Copper 27m@223pm Co 0.09% C [open] [email protected]% Cu, 301ppm Co A'
View entire presentation