Green Energy, On Demand slide image

Green Energy, On Demand

Australia's battery growth There is a requirement for significant BESS battery roll out along the east coast of Australia Approximately 123GWh of capacity needed by 2040 MWh 600 500 400 300 200 The only operating BESS's in Australia are located in SA VIC & OLD Batteries inserted into renewable energy zones fill the gaps in dispatchable supply allowing renewable generation to be used more effectively 100 0 Genex | Green Energy, On Demand | Presentation Current Operating BESS ā€ž GWh (thousands) Required BESS by 2040 50 40 30 50 20 20 10 NSW SA QLD VIC NSW SA Source: AEMO VIC QLD Source: Genex estimates 11
View entire presentation