NHPC Renewable Energy and Pump Storage Project Updates
New Initiatives
Pump Storage Project Scheme
(1) Maharashtra
26
एनएचपीसी
NHPC
S.No
Name/Place of PSP
Installed Capacity (MW)
1
Kengadi
1550
2
Jalond
2400
Present Status
MoU for the development of Pumped Storage Projects along with
RE sources in the state of Maharashtra has been signed with
Department of Energy, Govt. of Maharashtra on 06.06.2023.
3
Savitri
2250
4
Kalu
1150
➤ Preparation of PFR is under Process, likely to be prepared by Dec
2023.
Total
7350
(2) Andhra Pradesh (under JV mode with APGENCO)
S.No
Name/Place of PSP
1
Kamalapadu
2
Yaganti
Installed Capacity (MW)
950
1000
Total
1950
Present Status
➤ NHPC and Department of Energy, Govt. of Andhra Pradesh signed
an MoU on 04.03.2023 for investment for development of 2000 MW
of Pumped Storage Projects in the State in JV mode.
In line with above MoU, NHPC and APGENCO, Andhra Pradesh is
in advanced stage of discussions towards these two PSPs.View entire presentation