Eldorado Gold Operational and Financial Update slide image

Eldorado Gold Operational and Financial Update

Mineral Resources (Copper, Lead, Zinc) as of September 30, 2022 Project Measured Resources Indicated Resources Total Measured and Indicated Inferred Resources Contained Tonnes Cu Contained Cu Tonnes Cu Contained Cu Tonnes Cu Contained Cu Tonnes Cu Cu tonnes COPPER Skouries (x1000) % 90,714 0.51 466 tonnes (x1000) (x1000) 149,260 % tonnes (x1000) (x1000) 0.44 652 239,974 % 0.47 tonnes (x1000) (x1000) % (x1000) 1,118 67,657 0.40 267 TOTAL COPPER 90,714 0.51 466 149,260 0.44 652 239,974 0.47 1,118 67,657 0.40 267 Contained Tonnes Pb Contained Pb Tonnes Pb Contained Pb Tonnes Pb Contained Pb Tonnes Pb Pb tonnes LEAD (x1000) % tonnes (x1000) (x1000) % tonnes (x1000) (x1000) % tonnes (x1000) (x1000) % (x1000) Olympias 2,618 4.8 125 10,319 5.0 520 12,937 5.0 645 2,186 6.5 142 Stratoni 0 0.0 0 1,351 6.1 82 1,351 6.1 82 1,700 6.2 106 TOTAL LEAD 2,618 4.8 125 11,670 5.2 602 14,288 5.1 727 3,886 6.4 248 Contained Tonnes Zn Contained Zn Tonnes Zn Contained Zn Tonnes Zn Contained Zn Tonnes Zn Zn tonnes ZINC (x1000) Olympias 2,618 % 5.7 tonnes (x1000) (x1000) % tonnes (x1000) (x1000) % tonnes (x1000) (x1000) % (x1000) 150 10,319 6.6 682 12,937 6.4 831 2,186 7.3 158 Stratoni 0 0.0 0 1,351 8.7 117 1,351 8.7 117 1,700 9.3 158 TOTAL ZINC 2,618 5.7 150 11,670 6.8 799 14,288 6.6 948 3,886 8.1 316 > eldorado gold 60
View entire presentation