Investor Presentaiton slide image

Investor Presentaiton

Horseshoe South Mine - Main Pit Drilling confirms that channels and zones of manganese still present in and around the Main pit -7 185 400mN 656 500mE 656 600mE 656 700mE 656 800mE 059 060 061 M52/806 008 [email protected]% Mn 058 from surface 1m @ 18.3% Mn 7 185 150mN 7185 175mN 7 185 200mN 7 185 225mN HSRC062 HSRC063 HSRC016 600mRL- [email protected]% Mn from 7m 010 009 7185 300mN 047 [email protected]% Mn from 3m 046 048 054 [email protected]% Mn from 8m 011 050 006 053 051 [email protected]% Mn 049 from 5m 043 037 from 2m 057 056 [email protected]% Mn 590mRL Open Pit from 6m Mineralised Zone 055 [email protected]% Mn 007 from 1m open 12m [email protected]% Mn from 1m 11m 580mRL 12m [email protected]% Mn from 1m 5m @24.2% Mn 2m @29.4% Mn 2m @ 36.1% Mn 3m @ 34.5% Mn 5m @ 24.2% Mn from 2m [email protected]% Mn from 2m 570mRL 002 042 035 -7 185 200mN 044 003 005 [email protected]% Mn 052 016 064 from 3m 026 [email protected]% Mn from 9m 045 038 034 560mRL 039 027 080 004 079 040 028 033 Q 063 065 036 [email protected]% Mn from 8m 041 029 [email protected]% Mn 030 012 from 5m 062 [email protected]% Mn from 8m BRYAH RESOURCES LIMITED Bryah RC Drill hole with depth, metres 031 066 [email protected]% Mn [email protected]% Mn 032 from 4m section [email protected]% Mn from 5m from 6m 013 014 [email protected]% Mn from 4m 067 015 [email protected]% Mn from 2m 017 [email protected]% Mn from 3m 068 [email protected]% Mn from 2m [email protected]% Mn from 1m HORSESHOE SOUTH PROSPECT Main Pit Area (looking west) DRILL SECTION 656 800mE June 2020 Mineralised intercept (>35%Mn) 15 metres Mineralised intercept (>18%Mn) Mineralised zone (>10%Mn) BRYAH RESOURCES LIMITED HORSESHOE SOUTH PROSPECT Main Pit Area (West) DRILL HOLE LOCATION PLAN June 2020 GRADE METRES O 044 2020 RC Drill hole (prefix HSRC) (Mn% x interval) 2017 2019 RC Drill hole (prefix HSRC) Historical Mn workings 0-40 40-80 80-120 120-200 100 metres >200
View entire presentation