ANTIMONY-BASED LIQUID METAL BATTERIES
FEASIBILITY STUDY - CAPITAL COST SUMMARY
Initial
Sustaining Closure
Area
Detail
CAPEX
CAPEX
CAPEX
Total
CAPEX
(M$)
(M$)
(M$) (2)
Mine Costs (1)
84
119
(M$)
203
Processing Plant
433
49
483
Direct Costs
Notes:
1. Initial mining CAPEX includes
environmental remediation costs.
2. Closure and mitigation assume
self-performed costs, which will
differ for those assumed for
financial assurance calculations
required by regulators. Costs
include stream and wetland
On-Site Infrastructure
191
84
275
restoration and reclamation costs.
Off-Site Infrastructure
116
I
116
3. Numbers have been rounded and
may not sum correctly.
Indirect Costs
233
-
233
Owner's Costs
38
I
38
Offsite Environmental Mitigation Costs
14
14
Onsite Mitigation, Monitoring and
Closure Costs (2)
3
23
98
125
Total CAPEX without Contingency (3)
1,113
275
98
1,487
Contingency
150
20
1
171
Based on the 2020 Feasibility Study (FS)
which is intended to be read as a whole
and sections should not be read or relied
upon out of context. The information in
this presentation is subject to the
assumptions, exclusions and qualifications
contained in the FS. See "Regulatory
Information" at the end of this
presentation. For a summary of differences
between the FS and TRS, see "Cautionary
Note and Technical Disclosure" at the
beginning of this presentation.
Total CAPEX with Contingency (3)
1,263
296
99
1,658