Investor Presentaiton
Facilitate
investments
in hydrogen
infrastructure
Til
Action theme 1
Springboard from first renewable
hydrogen production in 2020 towards a
hydrogen economy
South Australia's key challenge in
realising a hydrogen economy is scaling
up large-scale renewable hydrogen
production to export-capable volumes as
part of a sustainable value chain.
الـ
While building up to export-scale production is a long-term
proposition, South Australia will methodically capitalise on its
comparative advantages and build upon its existing investments
in renewable hydrogen production infrastructure.
This will start with Australia's largest electrolyser planned to be
operational in metropolitan Adelaide in 2020.
UVERGN
From South Australia's first demonstration projects to building scale
The South Australian Goverment has
co-invested more than $17 million
in grants and $25 million in loans to
four hydrogen production projects.
These projects will generate learnings for
industry and regulators, grow community
awareness and understanding, and
develop workforce skills.
The projects are also key to establish
South Australia as a credible supplier of
renewable hydrogen supported by a
local workforce in a real-life environment,
and provide a platform for international
collaboration in developing a renewable
hydrogen value chain.
South Australia will leverage these
projects to reduce investment risk in
the next suite of large-scale renewable
hydrogen projects in South Australia,
which will aim to reduce production costs
per unit of renewable hydrogen.
Learnings:
- industry knowledge
- innovation & workforce development
- community awareness
-regulation, codes & standards
- international collaboration
First renewable
H₂ production
Domestic
applications
Large scale
export projects
Early export
projects
Project Scale
South Australia is on the move to facilitate
investments in hydrogen infrastructure...
Deliver the South Australian Hydrogen
Export Modelling Tool to inform the
establishment of renewable hydrogen
export supply chains
An interactive hydrogen map is available
at www.hydrogen.sa.gov.au to enable
international investors and project developers
to identify ideal sites in South Australia for
hydrogen infrastructure.
The South Australian Government will work
with industry on a landmark study of existing
and potential infrastructure required for an
international-scale, renewable hydrogen-
export value chain.
Its findings will be available across the
worldwide network of South Australian
trade and investment offices to inform key
considerations such as locations for hydrogen
production and conversion, volume of supply
potential, and the landed cost of renewable
hydrogen from South Australia.
Facilitate the development of hydrogen
infrastructure projects in South Australia
The South Australian Government has
co-invested more than $17 million in grants
and $25 million in loans to four renewable
hydrogen projects.
Led by the Department for Energy and
Mining, the South Australian Government
will continue to deepen its engagement
with key hydrogen industry stakeholders and
coordinate the State's efforts in scaling up its
hydrogen industry.
Develop a plan for the cost-effective
application of hydrogen in domestic
primary energy sectors
The South Australian Government's existing
renewable hydrogen pilots, projects and
demonstrations are designed to build
renewable hydrogen infrastructure, scale
the domestic market, and help develop a
substantial industry capable of export.
The South Australian Government is
committed to identifying cost-effective
applications for renewable hydrogen's wider
use in gas networks, transportation and
in industrial and remote applications; and
developing a plan to guide investment in
these areas. This will assist in achieving the
state's aim of net zero emissions by 2050 by
decarbonising other primary energy use.
Incorporate hydrogen into long-term
infrastructure planning
Infrastructure SA is an independent agency
responsible for framing South Australia's 20-
year Infrastructure Strategy, which will inform
a Capital Intentions Statement -a a five-year
rolling annual plan that will identify specific
major projects to be undertaken as a priority.
Infrastructure SA has been engaged to
consider hydrogen as part of its long-term
infrastructure planning.
ANZ
પાસના નાન
2020
mid-2020's
Time
Adelaide hydrogen vehicle showcase in
Victoria Square, Adelaide CBD
MIRAL 2
21
South Australia's Hydrogen Action Plan
Government of South Australia
September 2019
Fuel Cell
22
22View entire presentation