PTTEP Financial and Operational Overview slide image

PTTEP Financial and Operational Overview

Projects Details | Thailand | Project Name Status Phase 15 MTJDA 16 G9/43 Sales Vol Gas Sales Vol Liquid Participating Interest* (%) Latest Status (MMSCFD) (KBPD) 310 7 50% Normal operations 50% JOC Production PTTEP CPOC OP Exploration PTTEP 100% 17 G1/61 (Erawan) OP Ho Production 214 PTTEP 60% Condensate: 4 KBPD Crude: 8 KBPD • Mubadala 40% 18 G2/61 (Bongkot) OP Production 379 11 PTTEP 100% 19 G1/65 OP Exploration PTTEP 100% 20 20 Note: * G3/65 OP Exploration PTTEP 100% PTTEP denotes respective PTTEP subsidiaries participating in the project Sales volume represent average volume for 100% of the project during 3M2023 Status: OPPTTEP operatorship / JOC = PTTEP joint operatorship/ JV = PTTEP Joint Venture Partner 35 PTTEP Installed 2 WHPS On-going drilling activities on development and exploration/appraisal wells. Activity suspended All 6 rigs are in operations On-going drilling activities on existing and new platforms The remaining blocks of Bongkot was transitioned on 8 Mar 2023. Installed 1 sealine and 1 WHPS. On-going drilling activities on existing and new platforms. PSC signed. To start exploration phase. PSC signed. To start exploration phase.
View entire presentation