NHPC Renewable Energy and Pump Storage Project Updates
NHPC - Projects in Operation... contd.
एनएचपीसी
NHPC
Installed
S.No.
NHPC Project
Capacity
Design
Energy
Year of
Comm.
Capital Cost
Tariff (22-23)
as on 31.03.23
(Rs. /Kwh)
(MW)
(MU)
11
Teesta-V, (3x170)
510
2572.70
2008
2848.52
Type of the project
2.84* ROR with small pondage
Sikkim
(Mar)
12
Sewa-II, (3x40)
120
533.53
2010
1155.29
5.48* ROR with small pondage
UT of J&K
(Jun)
13
Chamera-III, (3x77)
231
1108.17
2012
2146.85
4.18
ROR with small pondage
Himachal Pradesh
(Jun)
14
Chutak, (4x11)
44
212.93
2013
945.34
9.91
ROR
UT of Ladakh
(Jan)
15
TLDP-III, (4x33)
132
594.07
2013
1942.69
5.57 ROR with small pondage
West Bengal
(Mar)
16
Nimoo Bazgo, (3x15)
45
239.33
2013
1071.21
10.61
ROR with small pondage
UT of Ladakh
(Jan)
17
Uri -II, (4x60)
240
1123.77
2014
2362.43
5.12*
ROR
UT of J&K
(Feb)
18
Parbati-III, (4x130)
520
1963.29
2014
2726.61
3.08* ROR small por
3.08* ROR with small pondage
Himachal Pradesh
(May)
TLDP IV, (4×40)
2016
1822.27
19
160
717.72
4.35
ROR with small poundage
West Bengal
(Aug)
Kishanganga, (3x110)
2018
20
330
1712.96
5711.55
4.10*
ROR with Pondage
UT of J&K
(Mar)
Total-A
5451
24601.37
39816.85
4.11
* Tariff Notification for 2019-24 yet