INFRASTRUCTURE FOR THE FUTURE
INVESTMENT IN INNOVATION
Building resilient networks for future generations
Victoria Power Networks
Solar Enablement Program
Currently being considered by the Australian Energy Regulatory (AER) this
program represents a $93m investment over five years that will enable most
customers to connect their 5kVa solar PV system and ensure 95% of
customers are able to export to the grid
This program will remove solar constraints where it is economic to do so â that
is where the benefits to customers outweigh the costs - and assist customers
where it is not
LiDAR Lab
VPN has established a new LiDAR processing lab to perform vegetation
inspection, focused on identifying multi-circuit clearance breaches. Through
automated modelling, the inspection needs to be accurate to within 5cm, as
such the models have been rigorously audited to provide assurance to the
business and maintenance teams.
The LiDAR Lab project will see all LiDAR services moved in-house by 2021 to
improve quality, minimise risks, reduce work hours and reduce costs
SA Power Networks
Upgrade Low Reliability Feeders
å
SA Power Networks have pursued a program to upgrade low reliability feeders
in their worst performing parts of the network. This program was not required
under the National Electricity Rules (NER) and was originally rejected by the
AER in their draft decision
Following further consultation with the Consumer Consultative Panel the
program gained unanimous consensus and the upgrade was accepted in the
AER's Final Determination based on the significant stakeholder support
Solar-Sponge Tariff
South Australia has the highest per capita level of rooftop solar. SAPN has
created an innovative tariff structure for residential customers. This tariff offers
a lower network charge during the middle of the day when solar output is
highest, to encourage shifting of electricity use to those times
Raising demand for grid supplied electricity in the middle of the day can help
manage voltage issues and thermal overloads associated with low demand,
while shifting demand away from the evening peak that can put heavy strain on
the network
Spark Infrastructure I Investor Presentation | August 2020