South America Q4 2016 Results • Plant performance remains the primary focus • Total copper recovery was 81.6% in Q4, affected by oxidized mineralization, offset by higher than reserve grades • Combined unit operating costs were $7.98 per tonne in Q4 • Continued low cost performance Q4 cash costs of $1.11/lb and sustaining cash cost of $1.54/lb Full year cash costs of $1.09/lb and sustaining cash cost of $1.51/lb 1. Precious metals production includes gold and silver production on a gold-equivalent basis. Silver is converted to gold at a 70:1 ratio. 2. Reflects combined mine, mill and G&A costs per tonne of ore milled. Unit costs reflect the deduction of expected capitalized stripping costs. 3. Cash cost and sustaining cash cost per pound of copper produced, net of by-product credits. HUDBAY PERU SUMMARY OPERATING STATISTICS Ore mined (million tonnes) Full Year Q4 2016 2016 6.2 26.5 Ore milled (million tonnes) 7.2 27.0 Copper grade milled 0.58% 0.60% Gold grade milled (g/t) 0.05 0.06 Silver grade milled (g/t) 4.65 4.90 Copper recovery 81.6% 82.4% Gold recovery 43.9% 48.4% Silver recovery 67.1% 64.9% Copper contained in conc. (kt) 34.0 133.4 Precious metals contained in conc. (koz)1 15.4 65.7 Combined unit operating $7.98 $8.09 costs ($/tonne)² Cash cost ($/lb)³ $1.11 $1.09 Sustaining cash cost ($/lb)³ $1.54 $1.51 23
View entire presentation