Investor Presentaiton
MIE Holdings Corporation
Emir-Oil O&G marketing options
Infrastructure Map
BELARUS
Brody
Moscow
makinak
UKRAINE
Kremenchug
Samaro
Orsk
Pavlodar
RUSSIA
Aaona
Karaganda
A15
KAZAKHSTAN
Kazakhsta
Korachagane Alasbe i
Benyok
Alynov
Kozokhatan
Oxpe
Kunojarska
Kumkel Karakon
Deusly
Kyzylorda
Dushonai
Druh
Urumqi
Almaty
UZBEKISTAN
Shegyr Tekesu KYRGYZSTAN
Fargona
TURKMENISTAN
Toshkent
Sea
Turkmenbashhonthou
Ashgabat
Bukhoro
TAJIKISTAN
Dushanber
Lisichanak
Odessa
GO
CPC
Now
Mohoc Cupid
Akou
ROMANIA Feodosio
1
Constando
BULGARIA Block Sea
bul
Samsun
Ankara De
Kirikala
TURKEY
CYPRUS
Mad Neroneon-Se
Ceyhan
_ GEORGEL
Erevan D
BTC
LEBANON SYR
EGYPT
Tako
IRAQ
Bogdoc
IRAN
Esfahan
Kaboul
AFGHANISTAN slamabad
ISRAIL
Bender
Koman
JORDAN
Geneve
hang
New Delic
SAUDI
Pension C
Bandar Abbos
PAKISTAN
INDIA
Source: IEA
ARABIA
CHINA
Existing oil pipeline
Proposed pipeline/
transportation system
Railroad
Tanker terminal
Aktau
Industrial User
3 km
Mangyshlak
Train Station
Oil Storage
RR Filling
Station
Uzen-Atyrau-Samara Oil Pipeline
Road distance
27km
KasTrans
Oil Pipeline
Connection
Rail Road
Oil pipeline
pipeline
Future oil
25km
Proposed
processing
station
Aksaz
40km
Emir
Oil Pipeline 12.2km
Gas Pipeline
8.5km
Dolinnoe
Oil Pipeline
8.3km
Future gas pipeline
Kariman
Mayak Gas Pipeline
System Connection
Export Pipeline
Gas pipeline
Group Unit
Gas Utilization Unit
•
Proposed gas pipeline
Proposed processing station.
New oil and gas processing station
Processing capacity: oil
12,000bopd, gas 600,000 m³/d
(21,000 mmcfgpd)
• FEED completed and the
proposal had been approved by
the government
Land rights already in place
⚫ Jan 2014: awarded China-listed
Beijing Oil HBP the contract for
skid-mounted oil and gas
processing equipment
Signed in Feb 2014 and
construction work has started
New oil pipeline
• Specification: length of 25km,
diameter of 219mm
• Transportation capacity: 2-
4.5mm bbl p.a.(5,450-
12,400BOPD)
Land rights already in place
Design underway
New gas pipeline
.
Specification: length of 35km,
diameter of 219mm
• Transportation capacity:
300,000-600,000 m³/d (10.6-
21.2 mmcfgpd)
Land rights agreement reached
Design underway
The proposed facilities expected to
be completed in 1H 2015
Proposed oil pipeline
Note: The diagram is only a schematic diagram, not scaled in actual ratio
33View entire presentation