NHPC -JV Projects Under Clearance S.No Projects Kwar (4x135) J&K (JV 1 between NHPC (49%) JKSPDC (49%), & PTC (2%) Design Installed Capacity (MW) Energy (MUs) 540 1975.54 Projects Under JV Cost (In Cr.) & PL Status 'एनएचपीसी NHPC 4948 (July18) All clearances are available. Consent from Govt. of J&K for waiver of 12% free power & water usage charges is awaited for processing of PIB by MoP. Tendering is in process. • A MoU has been exchanged among NHPC Limited, Jammu & Kashmir State Power Development Department (JKPDD) and J&K State Power Development Corporation (JKSPDC) for execution of 850 MW Ratle Hydroelectric Project (Jammu & Kashmir) in the august presence of Prime Minister of India on 3rd Feb 2019. PIB meeting held on 09.03.2020. After detailed deliberation, PIB recommended that Govt. of J&K should be taken on Board on all issues and modalities of the JV. Agreement between MOP and Govt. Of J&K with full financial closure is necessary before the proposal is considered for approval. Tendering for execution of Ratle H.E. Project through EPC mode is in progress. Ratle H. E. Project (J&K) 850 3136.80 5282 (Nov 18) TOTAL 1390 5112.34 10230 Foreign Assignment Under JV Scheme Chamkharchhu (Bhutan) 770 3344.47 6187 (Dec 16) JV Grand Total 2160 8456.81 16417 Project to be developed by JVC of NHPC and DRUKGreen Power Corporation, Bhutan. Joint venture Agreement cum Share Holder's Agreement of proposed JV Company is ready for signing. SHA & AOI shall be signed after finalisation of concession agreement with RGOB & CCEA approval of Gol. Revised draft material for PIB Memorandum submitted to MoP on 23.06.2017 & PIB memo circulated by MoP on 08.09.2017. Reply to all observations of various agencies stand submitted. NHPC vide letter dated 23.06.2020 has requested MoP to take up the issue of finalization of Concessional Agreement with MEA.
View entire presentation