Investor Presentaiton
NHPC -JV Projects Under Clearance
S.No
Projects
Kwar (4x135)
J&K (JV
1
between NHPC (49%)
JKSPDC (49%), & PTC (2%)
Design
Installed
Capacity (MW) Energy (MUs)
540
1975.54
Projects Under JV
Cost (In Cr.) &
PL
Status
'एनएचपीसी
NHPC
4948
(July18)
All clearances are available. Consent from Govt. of J&K for waiver of 12% free power &
water usage charges is awaited for processing of PIB by MoP. Tendering is in process.
•
A MoU has been exchanged among NHPC Limited, Jammu & Kashmir State Power
Development Department (JKPDD) and J&K State Power Development Corporation
(JKSPDC) for execution of 850 MW Ratle Hydroelectric Project (Jammu & Kashmir) in
the august presence of Prime Minister of India on 3rd Feb 2019.
PIB meeting held on 09.03.2020. After detailed deliberation, PIB recommended that
Govt. of J&K should be taken on Board on all issues and modalities of the JV.
Agreement between MOP and Govt. Of J&K with full financial closure is necessary
before the proposal is considered for approval.
Tendering for execution of Ratle H.E. Project through EPC mode is in progress.
Ratle H. E. Project (J&K)
850
3136.80
5282
(Nov 18)
TOTAL
1390
5112.34
10230
Foreign Assignment Under JV Scheme
Chamkharchhu (Bhutan)
770
3344.47
6187
(Dec 16)
JV Grand Total
2160
8456.81
16417
Project to be developed by JVC of NHPC and DRUKGreen Power Corporation,
Bhutan.
Joint venture Agreement cum Share Holder's Agreement of proposed JV
Company is ready for signing.
SHA & AOI shall be signed after finalisation of concession agreement with RGOB &
CCEA approval of Gol. Revised draft material for PIB Memorandum submitted to
MoP on 23.06.2017 & PIB memo circulated by MoP on 08.09.2017. Reply to all
observations of various agencies stand submitted.
NHPC vide letter dated 23.06.2020 has requested MoP to take up the issue of
finalization of Concessional Agreement with MEA.View entire presentation