Investor Presentaiton
Brumby Creek
First ever drilling programme at Brumby Creek in 2019 yielded consistent results over a wide area
645 000mE
645 200mE
645 400mE
645 600mE
[email protected]% Mn
-7 192 200mN
-7 192 000mN
from 2m and
9m @ 18.6% Mn
from 15m
9m @21.1% Mn
from 5m
[email protected]% Mn
from 1m
[email protected]% Mn
from 3m
[email protected]% Mn
from 16m
8m @21.3% Mn
from 10m
[email protected]% Mn
from 5m
050
032
clinal Axis
065
E52/3237
7m @ 22.6% Mn
from 12m
[email protected]% Mn
from 7m
3m @23,2% Mn
from surface and
3m @ 25.9% Mn
from 10m
5m @ 23.2% Mn
from surface and
[email protected]% Mn
from 9m
16m @21.2% Mn
from 14m
3m @27,0% Mn
009
012
053
008 019
017
049
018
007
015
006
005 016
031
030
029
004 003
028
002
001
B
[email protected]% Mn
027
022
from 1m and
026
7m @ 23.8% Mn
from 9m
025 024
023
-7191 800mN
059
050
062
061
from surface
4m @ 20.2% Mn
from 5m and
16m @ 20.4% Mn
from 12m
5m @26.7% Mn
from 1m
2m @ 25.6% Mn
from 3m
Best intervals at Brumby Creek (18% Mn cut-off grade) include:
✓ BRRC044 - 7 metres @ 26.5% Mn (2-9m),
-
including 2 metres @ 32.0% Mn, and
9 metres @ 18.6% Mn (15-24m)
✓ BRRC034 15 metres @ 26.2% Mn (3-18m), including
2m @ 31.9% Mn & 2m @ 33.5% Mn
BRRC036
✓ BRRC006 -
14 metres @ 22.8% Mn (5-19m)
5 metres @ 23.2% Mn (0-5m) and
10 metres @ 25.5% Mn (9-19m), including.
2 metres @ 31.3% Mn
✓ BRRC016 - 16 metres @ 21.2% Mn (14-30m), including
2 metres @30.8% Mn
✓ BRRC035 - 10 metres @ 22.6% Mn (1-11m), including
2 metres @30.3% Mn
Mineralisation open along strike on both areas tested.
GRADE METRES
2019 RC Drill hole (prefix BRRC)
(Mn% x interval)
ROCK CHIP SAMPLES
(%Mn)
• 0-40
<20%
- 40-80
20% to 30%
80-120
B 30% to 40%
100 metres
120-200
40% to 50%
>200
>50%
BRYAH RESOURCES
LIMITED
BRUMBY CREEK PROSPECT
DRILL HOLE LOCATION PLAN
September 2019
(assay pending)
Mapped ManganeseView entire presentation