Investor Presentaiton slide image

Investor Presentaiton

Brumby Creek First ever drilling programme at Brumby Creek in 2019 yielded consistent results over a wide area 645 000mE 645 200mE 645 400mE 645 600mE [email protected]% Mn -7 192 200mN -7 192 000mN from 2m and 9m @ 18.6% Mn from 15m 9m @21.1% Mn from 5m [email protected]% Mn from 1m [email protected]% Mn from 3m [email protected]% Mn from 16m 8m @21.3% Mn from 10m [email protected]% Mn from 5m 050 032 clinal Axis 065 E52/3237 7m @ 22.6% Mn from 12m [email protected]% Mn from 7m 3m @23,2% Mn from surface and 3m @ 25.9% Mn from 10m 5m @ 23.2% Mn from surface and [email protected]% Mn from 9m 16m @21.2% Mn from 14m 3m @27,0% Mn 009 012 053 008 019 017 049 018 007 015 006 005 016 031 030 029 004 003 028 002 001 B [email protected]% Mn 027 022 from 1m and 026 7m @ 23.8% Mn from 9m 025 024 023 -7191 800mN 059 050 062 061 from surface 4m @ 20.2% Mn from 5m and 16m @ 20.4% Mn from 12m 5m @26.7% Mn from 1m 2m @ 25.6% Mn from 3m Best intervals at Brumby Creek (18% Mn cut-off grade) include: ✓ BRRC044 - 7 metres @ 26.5% Mn (2-9m), - including 2 metres @ 32.0% Mn, and 9 metres @ 18.6% Mn (15-24m) ✓ BRRC034 15 metres @ 26.2% Mn (3-18m), including 2m @ 31.9% Mn & 2m @ 33.5% Mn BRRC036 ✓ BRRC006 - 14 metres @ 22.8% Mn (5-19m) 5 metres @ 23.2% Mn (0-5m) and 10 metres @ 25.5% Mn (9-19m), including. 2 metres @ 31.3% Mn ✓ BRRC016 - 16 metres @ 21.2% Mn (14-30m), including 2 metres @30.8% Mn ✓ BRRC035 - 10 metres @ 22.6% Mn (1-11m), including 2 metres @30.3% Mn Mineralisation open along strike on both areas tested. GRADE METRES 2019 RC Drill hole (prefix BRRC) (Mn% x interval) ROCK CHIP SAMPLES (%Mn) • 0-40 <20% - 40-80 20% to 30% 80-120 B 30% to 40% 100 metres 120-200 40% to 50% >200 >50% BRYAH RESOURCES LIMITED BRUMBY CREEK PROSPECT DRILL HOLE LOCATION PLAN September 2019 (assay pending) Mapped Manganese
View entire presentation