Investor Presentaiton slide image

Investor Presentaiton

JINDAL STEEL & POWER India: Superior performance by technology- enabled plants Plant (Location/Capacity) Technological Specifications Product Mix Angul Steel Plant (Odisha / 5.0 MTPA for SMS) 3.25 MTPA blast furnace, one of the largest in India. One of the largest 5 MTPA sinter plants 1.2 MTPA plate mill that produces plates of up to 5 meters in width 1.5 MTPA bar mill that produces a wide range of the Jindal Panther branded TMT rebars 6.5 MTPA coal washery, 2 x 500 TPD lime and dolomite plant • Plate, TMT, Billet Iron ore from captive mine in Kasia (Odisha), Tensa (Odisha) and open market Pellet from Barbil plant . Raw Materials Sourcing • Coking coal sourced from Australia, Mozambique mine and merchant mining groups . 810 MW captive power plant Power/Coal Preparation • Coal washery (6.5 MTPA) FY21 Utilization ° 73.6% (SMS) • Raigarh Steel Plant (Chhattisgarh / 3.6 MTPA for SMS) Blast furnace (3.05 MTPA) 1.32 MTPA DRI plant the world's largest coal-based sponge iron manufacturing facility Head-hardened rail manufacturing facility that produces up to 121m long rail pieces State-of-the-art plate mill (1.0 MTPA) Medium and light structural mill (0.6 MTPA) Modern rail and universal beam mill (0.75 MTPA) Rail, Structures, Plates, HRC, Bloom, Billet, Rounds Iron ore from captive mine in Kasia (Odisha), Tensa (Odisha) and open market Pellet from Barbil plant Coking coal sourced from Australia, Mozambique mine and merchant mining groups 284 MW coal and waste heat captive power plant 540 MW coal captive power plant at Dongamauha 88.7% (SMS) Plant (Location) Technological Specifications Product Mix Raw Materials Sourcing Power/Coal Preparation • FY21 Utilization • Barbil (Odisha/9.0 MTPA) 4.50MTPA dry-grinding and 4.50MTPA wet-grinding palletisation unit • Barbil Plant has emerged as pellet exporter in recent years • 9 MTPA Pelletization complex • Pellet • Iron ore from captive mine in Kasia (Odisha), Tensa (Odisha), and open markets Maximum sourced from 810MW captive power plant; remaining sourced from grid 80.8% Patratu (Jharkhand / 0.6 MTPA for WR and 1.0 MTPA for TMT) Finished steel installed capacity of 1.6 MTPA, including a 1 MTPA bar mill and a 0.6 MTPA wire rod mill TMT, Wire Rod Billet for WRM and TMT from Angul and Raigarh Plant Entire power requirements from DVC - Damodar Valley Corporation 72.6% (WR), 21.1% (TMT) 28
View entire presentation