FAROE ISLANDS UNITED KINGDOM Mongstad Bergen NORWAY Stavanger Oslo DENMARK SWEDEN Combined heat and power plant being built Her bygger Statoil Hydro og DONG energy Energiverk Mongstad EVM StatoilHydro and DONG energy are building Mongstad CHP plant Statoil Hydro DONG The next big step for CO2-capture from flue gas sources; The European CO2 Test Centre (TCM) plus full scale CO2-capture at Statoil Hydros Mongstad refinery ■ From the left: ■ Location map, picture of the Mongstad refinery, an illustration of the power plant ■ Rule of the thumb: the capture part may be ¾ of the total CCS-cost ■ The primary objective of TCM is to test and qualify technology for the capture of CO2 in order to reduce the costs and risks associated with large-scale plants Statoil Hydro