Combined heat and power plant being built
Her bygger Statoil Hydro
og DONG energy
Energiverk Mongstad EVM
StatoilHydro and DONG
energy are building
Mongstad CHP plant
Statoil Hydro
DONG
The next big step for CO2-capture from flue gas sources;
The European CO2 Test Centre (TCM) plus full scale CO2-capture at
Statoil Hydros Mongstad refinery
■ From the left:
■ Location map, picture of the Mongstad refinery, an illustration of the
power plant
■ Rule of the thumb: the capture part may be ¾ of the total CCS-cost
■ The primary objective of TCM is to test and qualify technology for the
capture of CO2 in order to reduce the costs and risks associated
with large-scale plants