2021 Interim Results slide image

2021 Interim Results

5G Network Deployment Maintain focused deployment while saving substantial investments & costs through "co-build co-share" Dynamic investment with due Achieve 5G industry-leading regard to technology advancement, value chain maturity, market & business demand, etc. network speed, while network 5G coverage comparable with the leading operator • 2020-2022 expected to be the peak 5G investment period • 2021 5G CAPEX budget: RMB 35.0 bil, no. of 5G BTS in use by end of 2021: 700k, net add of 5G BTS: =320k • Net add of 5G BTS in 1H2021: =80k, reaching >460k Coverage • Sped up in-depth & indoor coverage in city urban areas & coverage of major counties & affluent towns, fully leveraging the hybrid deployment of 2.1GHz & 3.5GHz bands 2.1GHz band: mainly used for wide coverage & general indoor coverage to lower TCO Capability • SA network fully compatible; introduced key technology of R16 to enhanced support for 2B Strong push for network slicing, uRLLC, 5G private networks, MEC & VONR commercialisation a China unicom中国联通 2021 Interim Results 13
View entire presentation