Investor Presentaiton slide image

Investor Presentaiton

Bass Basin Beach 53.75% producing assets, 50.25% non-producing, Beach operated FY19 production Rest of Beach 29.4 MMboe FY20 Focus: Lang Lang Gas Plant Continue development studies on Trefoil gas field · Planning for 3D seismic over White Ibis/Bass Bass Basin • 1.7 MMboe FY19 2P reserves Bass Basin 20 MMboe 222 Rest of Beach 326 MMboe • Maintain high facility reliability • Beach to progress discussions with gas buyers to contract the remaining Yolla 2P reserves beyond expiration of current contract beach Victoria 0 10 20 30 40 50 km Victoria Tasmania Facility Gas pipeline Gas field Beach operated permit T/RL3 Trefoil T/RL2 Yolla T/L1 White Ibis T/RL4 Bass T/RL5 BG 18-0001A
View entire presentation