Investor Presentaiton
Ore reserve and mine plan
A low-risk Mine Plan underpinned by 92% Ore Reserves
Classification
Mt
Pb (%)
Pb (kt)
Ag (g/t)
Ag (Moz)
Proved
6.8
4.1
275
53.0
11.5
Probable
6.9
3.2
219
27.6
6.1
Total
13.6
3.6
494
40.2
17.6
.
Reported at cut-off of 1.5% Pb
Base Case Quarterly Mine Plan
Mined Tonnes ('000 t)
600
500
400
300
200
100
M
L
Measured
5
ཙ ན སྟྲ
Indicated
Inferred
Pb Grade (right axis)
Pacifico Minerals Limited ASX:PMY
Lead (%)
6.0%
5.0%
4.0%
3.0%
2.0%
1.0%
Pacifico
Minerals Ltd
The PFS Base Case incorporates the mining
of 14.8Mt of ore over an initial 10-year mine
life from four deposits, namely Omega, A, B
and southern portion of Norton.
·
·
Mineralisation from 20m.
Flat topography and easy free dig in first 18m.
Life of Mine Strip Ratio of 8.0x (volumetric basis).
Ministerial and WA Environmental Protection
Authority ("EPA") approval for an open pit mine
and infrastructure¹.
1Section 45C change proposal to be submitted to the EPA to reflect advancements.
Refer ASX announcement 25 August 2020 for further information