COD 2022-24 Mature Pipeline¹ (GW) By geography By technology enel COD COD 2022 2023 2024 Total 2022 2023 2024 Total Italy Iberia 0.0 0.4 4.7 5.2 0.1 2.8 2.7 5.5 Wind 0.0 1.2 12.3 13.6 Latin America 0.0 2.8 9.7 12.5 Rest of Europe 0.0 0.8 3.0 3.8 Solar Hydro 0.1 11.4 21.0 32.4 0.0 0.0 0.1 0.2 North America 4.3 6.5 10.7 Geothermal 0.0 0.0 0.1 0.1 Africa, Asia & Oceania 1.5 7.0 8.5 Total RES Pipeline 0.1 12.6 33.6 46.3 Total RES Pipeline 0.1 12.6 33.6 46.3 Storage 0.0 3.2 6.0 9.2 Storage 0.0 3.2 6.0 9.2 Total Mature Pipeline 0.2 15.7 39.6 55.5 Total Mature Pipeline 0.2 15.7 39.6 55.5 1. Rounded figures By geography2 Italy 19% 11% Iberia 12% Latin America 46 GW 23% Rest of Europe 27% North America 8% 1. Rounded figures. 2. Storage is not included. Africa, Asia & Oceania By COD² 0% By technology² 29% 27% 2022 Wind 46 GW 46 GW 2023 Solar & Other 2024 71% 73% 110