Optimising Costs from a Stable Base slide image

Optimising Costs from a Stable Base

BEST-IN-CLASS TAILINGS MANAGEMENT Best-in-class design Industry leading safety management Starter dam Engineered construction More robust than tailings-built downstream dam Downstream Drainage Group Technical Specialists Internal risk assurance Independent TRP BU Technical Standard expert State-of-the-art monitoring: 16 Water level indicators 11 Piezometers 2 Internal drainage flow meters 1 Total monitoring station (24h x 7days) Orbital satellite INSAR 4 Sirens 12km downstream of the dam - Fibreoptic monitoring at the overflow system Engineer of Record Operation 6 levels of assurance: 2 internal, 2 external, 2 independent â‘©AngloAmerican 11
View entire presentation