NHPC Capacity Addition and Financial Overview
NHPC: Projects Under Construction
Project Under Construction-Standalone
NHPC Project
Installed
Capacity
(MW)
Design
Energy (MU)
Type of the
project
CCEA Estimated
Cost (Rs. Crore)
(Price Level)
Anticipated
Project Cost (Rs.
Crore)
28
एनएचपीसी
NHPC
Provisional
Project
Expenditure till
-March'23 (Rs.
Crore)
Expected
Commissioning
Schedule
Subansiri
Lower (8X250)
2000
7422
Assam/ Ar. Pradesh
Run of River with
small pondage
6285.33 (Dec'02)
21247.54
(completion.
level))
17985.13
FY 24-25 (Q-3)
Parbati II (4X200)
800
3124
Himachal Pradesh
Run of River with
small pondage
3919.59 (Dec'01)
11134.54 (July'22)
10512.65
FY 23-24 (Q-4)
Dibang (12X240)
2880
11223
Arunachal Pradesh
Hydropower cum
flood moderation
31876.39 (May'21)
31876.39 (May'21)
2146.96
FY 31-32 (Q-4)
scheme
Total (A)
5680
21769
42081.31
64258.47
30644.74View entire presentation