Investor Presentaiton slide image

Investor Presentaiton

Water depth (metres) 20 20 0 01/01/2010 40 120 Water level rise 100 Water depth (m) Height of lowest point of completed spillway 00 80 60 60 29/01/2010 26/02/2010 26/03/2010 23/04/2010 Date 21/05/2010 18/06/2010 16/07/2010 -1 0 1 2 + 50 CO 6 7 8 Rate of filling (metres per day) 3
View entire presentation